• Profile
  • Project Manager at Enhanced Drilling Solutions Co., Ltd.
  • Texas A&M University, College
  • Thailand
This profile has been automatically generated based on publicly available information all around the web. If this is you, you can Take control of this profile. More about Yatedo Profiles
  • Professional Experience

    2010 - Present
    EDSL provides project management services for oil and gas companies in SE Asia. We have expertise in drilling, completions and well abandonments, both onshore and offshore, utilizing conventional rigs and hydraulic workover/drilling rigs.
    2010 - Present
    EDSL provides project management services for oil and gas companies in SE Asia. We have expertise in drilling, completions and well abandonments, both onshore and offshore, utilizing conventional rigs and hydraulic workover/drilling rigs.
    2010 - 2011
    Responsible for managing all aspects of the well testing operation on a high pressure gas well in Block L in Brunei. Responsibilities also included providing vacation relief for the AED Senior Drilling Engineer and Drilling Manager during the drilling of the well.
    2003 - 2005
    Responsible for all aspects of the drilling operations in Bangladesh, including operations, engineering and personnel issues.Accomplishments included building a drilling organization from the ground up, contracting and mobilizing all equipment and services needed, and the successful completion of the Moulavi Bazar drilling campaign under budget with no lost time accidents.
    2001 - 2003
    Responsibilities included engineering support for drilling operations in the Gulf of Thailand, liaison to the "Big Oil" asset team, manager of drilling fluids and solids control contracts, as well as the training and mentoring of Thai national staff.
    1999 - 1999
    Responsible for engineering support for all international drilling operations. Elected to resign from company and receive severance package following the completion of the
    1998 - 1999
    Responsible for the day-to-day drilling, completion and workover operations in the Gulf of Mexico. Responsibilities included program approval, selection of equipment and services, contract negotiation and approval, supervision of onsite drilling personnel and engineering support.
    1998 - 1998
    Responsible for the day-to-day operations of drilling and workover operations in the Mann Field in Myanmar (Burma). Responsibilities included program approval, supervision of onsite drilling personnel and the training of local professionals. Well types included straight and directional wells drilled in high pressure environments up to 22 ppg.
    1997 - 1997
    Responsible for the engineering and onsite supervision for the drilling of a slim hole horizontal re-entry well in Japan for Japan Energy Development. The well was completed 12 days ahead of schedule.Responsible for business development in Malaysia, India and Indo-China. Responsibilities included preparing tenders for various projects from basic bundled services to full project management as well as making presentations to potential clients with regard to Baker's technological and project management expertise in the region.
    1995 - 1997
    Oil & Energy | 1001-5000
    Supervised the engineering, planning and daily monitoring of wells being drilled in the Cooper Basin in South Australia. Responsibilities included the supervision of six drilling engineers and nine rigs while drilling approximately 40 wells to depths between 5,000' and 13,000'. Well types included straight, directional, horizontal and re-entry. Responsible for approving drilling programs, rig scheduling and negotiating contracts for all required services. Also responsible for tendering for two drilling rigs that were imported from the US to Australia.
    1994 - 1995
    Supervised the engineering, planning and daily monitoring of wells being drilled for Newfield Exploration in the Gulf of Mexico. Responsibilities included engineering and onsite supervision during the drilling of extended reach and horizontal wells as well as the onsite supervision of perforating and gravel pack operations on conventional wells. Responsible for the management of equipment procurement and logistics as well as coordinating with service companies and third party contractors, including turnkey bid requests and drilling rig selection.
    1991 - 1993
    Chemicals
    Supervised the engineering, planning and daily monitoring of wells being drilled for Maraven, SA in and around Lake Maracaibo in Venezuela. This included drilling with land rigs and jack-ups along with slim hole drilling utilizing continuous coring techniques. The implementation of emerging technologies required coordination with service companies' R&D groups, team building and training of local personnel.Responsible for the engineering on a 30 million dollar turnkey drilling project for Pemex in the Bay of Campeche. This included risk assessments, writing drilling procedures and the supervision of onsite drilling engineers. Coordinated a team of all service companies and third party contractors. Responsible for the management of equipment procurement and logistics.Instrumental in the development of a Drilling Operations Manual for Triton International for the drilling of wells onshore as well as drilling with jack-ups and floating rigs. Responsible for the planning and drilling of domestic (USA) wells on a turnkey basis. This included bidding, drilling procedures, and onsite supervision of drilling operations for wells on land, inland bays and offshore. International responsibilities included performing cost estimates and feasibility studies for drilling wells in Russia, Trinidad
    1990 - 1991
    Responsible for the onsite supervision of all aspects of the completion operations for a Coal Bed Methane project in Central Alabama. This included hydraulic fracturing, log analysis and acidizing of coal seams. Office responsibilities included supervision, fracture design and post-fracture well productivity.
    1989 - 1990
    Tool PusherResponsible for the onsite supervision of workover rig and crew while performing completion and remedial operations for major and independent oil companies in Southeast Texas.
    1988 - 1989
    Responsible for the ongoing production operations of approximately twenty wells in South Louisiana. This included onsite supervision of rig operations as well as analysis of the production capabilities of individual wells to improve overall field performance.
    1985 - 1988
    Responsible for the engineering and planning, as well as onsite supervision of wells drilled in Texas, Louisiana and Florida. Well types included straight and directional wells drilled on land, offshore and in inland waters. Responsibilities included the supervision of all drilling and completion operations, including fracture stimulation and acidizing operations.
    Show All Professional Experiences (20)
  • Educational Background

  • Related People

    Loading... Please Wait...
  • Web Search Results

    Web pages that may be related to Wade Davis

    Show all Web search results (50)
Looking for another Wade Davis ?